Summary

GlobalData’s Construction Intelligence Center (CIC) is currently tracking water and sewage construction projects in the Americas with a total value of US$ 101.0 billion. Of this, US$41.1 billion is in the execution stage and US$ US$36.0 billion is in the planning stage. The US accounts for the highest value with US$72.9 billion, followed by Mexico with projects valuing US$6.0 billion. Canada and Chile follow with a value of US$5.8 billion and US$4.0 billion respectively. The highest value water and sewage projects in the region are the US$11.0 billion Sacramento to San Joaquin River Delta Conveyance System, and the US$6.0 billion New York City Water Tunnel No. 3, both in the US.

The US is the dominant economic market in the Americas, and has the highest population with the greatest requirement for efficient water and sewage infrastructure. There are 155,000 drinking water systems across the US and 800,000 miles of public sewerage pipes, many of which were installed in the early to mid-twentieth century with a lifespan of 75-100 years. The American Society of Civil Engineers (ASCE) estimates that for the period of 2016-2025 there is funding of US$45 billion, although US$150 billion is required, leaving a substantial funding gap of US$105 billion. According to the American Water Works Association, upgrading existing water systems and meeting the drinking water infrastructure needs of a growing population will require at least US$1 trillion in investment. Although Latin America has one third of the world’s freshwater resources, inefficient infrastructure results in a 40% loss of drinking water before it reaches users. Recent market studies identified Latin America’s municipal water market being valued at US$21.16 billion in 2018.

Key Highlights

- The total pipeline of projects is valued at US$101.0 billion with US$10.2 billion being spent in 2019 and US$15.3 billion in 2020.
- The highest value of projects are at the execution stage with a total value of US$41.1 billion, followed by projects in the planning stage with US$36.0 billion.
- Projects in the pre-execution stage amount to US$18.10 billion, while those at the pre-planning stage total US$5.8 billion.
- Assuming all projects in the current pipeline proceed as planned, spending will reach US$15.3 billion in 2020 and fall to US$6.7 billion in 2023. The highest value of project completions will be in 2022, with a value of US$19.6 billion.
- Collection and transmission projects account for the highest value with US$42.0 billion.
- The top contractors in the region are Kiewit Corp based in the US and Dragados, based in Spain. The top consulting engineers are Jacobs Associates based in the US and Cowi AS based in Denmark.

Scope

- The report provides analysis based on CIC projects showing total project values for the Americas and analysis by stage and funding for the top ten countries. The top 50 projects are listed for the region giving country, stage, value of water and sewage construction.
- Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners. Country profiles are provided for the top 10 countries including the US, Mexico and Canada.

Reasons to buy

- Gain insight into the development of the water and sewage construction sector.
- Assess all major projects by value, start date, scope and stage of development for the region and top 10 countries to support business development activities.
- Plan campaigns by country based on specific project opportunities and align resources to the most attractive markets.

'

Table of Contents
1. OVERVIEW
2. SECTOR ANALYTICS
1.1. Collection and Transmission
1.2. Containment
1.3. Treatment Plants
1.4. Other Water and Sewage Infrastructure 17
1.5. Desalination Plants 18
3. PROJECT ANALYTICS BY COUNTRY
3.1. The US
3.2. Mexico
3.3. Canada
3.4. Chile
3.5. Brazil
3.6. Colombia
3.7. Argentina
3.8. Peru
3.9. Panama
3.10. Paraguay
4. ABOUT GLOBAL DATA
4.1. GlobalData at a Glance
4.2. GlobalData Construction
4.3. Disclaimer
4.4. Contact Us

List of Tables
Table 1: The Americas - Water and Sewage, Construction Project Pipeline, Value by Country and Stage (US$ million)
Table 2: The Americas - Water and Sewage, Construction Projects, Top 50 Projects by Value
Table 3: The Americas - Water and Sewage, Construction Projects, Key Contractors
Table 4: The Americas - Water and Sewage, Construction Projects, Key Consulting Engineers
Table 5: The Americas - Water and Sewage, Construction Projects, Key Project Owners

List of Figures
Figure 1: The Americas - Water and Sewage, Construction Project Pipeline, (US$ million)
Figure 2: The Americas - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 3: The Americas - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 4: The Americas - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 5: The Americas - Water and Sewage, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 6: The Americas - Water and Sewage, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 7: The Americas - Water and Sewage, Construction Project Pipeline, Type by Value and Stage (US$ million)
Figure 8: The Americas - Collection and Transmission, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 9: The Americas - Collection and Transmission, Construction Project Pipeline, Value by Stage (US$ million)
Figure 10: The Americas - Containment, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 11: The Americas - Containment, Construction Project Pipeline, Value by Stage (US$ million)
Figure 12: The Americas - Treatment Plants, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 13: The Americas - Treatment Plants, Construction Project Pipeline, Value by Stage (US$ million)
Figure 14: The Americas - Other Water and Sewage Infrastructure, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 15: The Americas - Other Water and Sewage Infrastructure, Construction Project Pipeline, Value by Stage (US$ million)
Figure 16: The Americas - Desalination Plants, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 17: The Americas - Desalination Plants, Construction Project Pipeline, Value by Stage (US$ million)
Figure 18: The US - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 19: The US - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 20: The US - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 21: Mexico - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 22: Mexico - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 23: Mexico - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 24: Canada - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 25: Canada - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 26: Canada - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 27: Chile - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million) 23
Figure 28: Chile - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 29: Chile - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 30: Brazil - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 31: Brazil - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 32: Brazil - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 33: Colombia - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 34: Colombia - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 35: Colombia - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 36: Argentina - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 37: Argentina - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 38: Argentina - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 39: Peru - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 40: Peru - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 41: Peru - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 42: Panama - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 43: Panama - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 44: Panama - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 45: Paraguay - Water and Sewage, Construction Project Pipeline, Value by Stage (US$ million)
Figure 46: Paraguay - Water and Sewage, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 47: Paraguay - Water and Sewage, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)

$1,950.00

Research Assistance

We can help you find
data and analyses
relevant to your needs,
or prepare a custom report.

Please contact us at [email protected]
or +1 212 564 2838

 

Custom Research

Contact us to speak
with your industry analyst.

[email protected] 
+1 212 564 2838

 



Discount Codes

Request Discount Codes
for reports of interest to you.

[email protected]
+1 212 564 2838